Piano di ricostruzione post-sisma: Il G.I.S. per censire il danno
Parole chiave:
GIS, ricostruzione, danno, mitigazioneAbstract
Possible scenarios of post-earthquake, should be outlined in advance, planned for time, declining, on the one hand the time and resources involved, elements of strategic planning and to the other side ways and actions, elements of structural and operational planning, trying to derived from the experience gained, strategies and guiding principles, which are not to be reinvented in every event, but that fit from time to time, to the peculiarities of the territory affected. This could help predict the pattern of strategic actions and priorities to
protect against future events.
In this context it has been analyzed the disaster suffered by the city of Foligno, one of the areas most affected by the earthquake in 1997.
After more than 15 years after the event, thanks to the data available today, is possible to understand with greater completeness the results in the area. In this perspective, the cataloging of data within a geodatabase, allowed to contain in one structure, different information, suggesting new and different analyzes. The survey conducted using the G.I.S. as a tool, it has enabled us to open up new scenarios, preparatory to starting a real policy of prevention of seismic risk.
Riferimenti bibliografici
Alexander, D.E.1,. (2005) The meaning of disaster: a reply to Wolf R. Dombrowsky. In R.W. Perry and E.L. Quarantelli (eds) What is a Disaster? New Answers to Old Questions. Xlibris Press, Philadelphia.
Angeletti Paolo, Baciucco Federica, Barluzzi Marco, Battisti Paolo, Macaluso Patrizia, Materazzi Patrizia, Panella Roberta. Confronto fra danni, vulnerabilità ed interventi di consolidamento.
Il caso dell'Umbria negli ultimi eventi sismici del 1997-1998. Ed.2007.
Calace F. 2009 Ricostruire sà¬, ma come. Come fare tesoro delle esperienze, "Urbanistica Informazioni”, n. 226, p. 8.
Friesema, H. Paul; Caporaso, James; Goldstein, Gerald; Lineberry, Robert; and Godschalk David R, 1999 Natural Hazard Mitigation- Recasting Disaster Policy and Planning; Island Press, Washington D.C
Haas, J. Eugene, Robert W. Kates, and Martyn J. Bowden, editors. 1977. Reconstruction Following Disaster. Cambridge, Massachusetts: MIT Press. 331 pages.
Lizarralde Gonzalo ,2000 Reconstruction management and post-disaster low-cost housing; the case for social reconstruction McGill University Montreal.
Menoni Scira,1997. Pianificazione e incertezza. Elementi per la valutazione e la gestione dei rischi territoriali, ed. Franco Angeli.
Giovanni Pietro Nimis, 2009 Terre mobili, dal Belice al Friuli dall'Umbria all'Abruzzo. Collana Saggine.2009 Donzelli Editore
Istituto Italiano di Geofisica e Vulcanologia (INGV), Web site, http://www.ingv.it, accesso 13 gennaio 2013.
Pistocchi A., Luzi L., Napolitano P. 2002 : The use of predective modeling techniques for optimal exploitation of spatial database: a case of study in landslide, hazard mapping with expert system –like methods – Enviromental Geology, 41;
##submission.downloads##
Pubblicato
Come citare
Fascicolo
Sezione
Licenza
Gli autori che pubblicano su questa rivista accettano le seguenti condizioni:- Gli autori mantengono i diritti sulla loro opera e cedono alla rivista il diritto di prima pubblicazione dell'opera, contemporaneamente licenziata sotto una Licenza Creative Commons - Attribuzione che permette ad altri di condividere l'opera indicando la paternità intellettuale e la prima pubblicazione su questa rivista.
- Gli autori possono aderire ad altri accordi di licenza non esclusiva per la distribuzione della versione dell'opera pubblicata (es. depositarla in un archivio istituzionale o pubblicarla in una monografia), a patto di indicare che la prima pubblicazione è avvenuta su questa rivista.
- Gli autori possono diffondere la loro opera online (es. in repository istituzionali o nel loro sito web) prima e durante il processo di submission, poiché può portare a scambi produttivi e aumentare le citazioni dell'opera pubblicata (Vedi The Effect of Open Access).